Supply Rockwool Blanket Project Schedule Synchronized

Product Details
Customization: Available
Feature: Durable, Easy to Install, Fierproof, Flame Retardant, Heat Insulation, Noise Reduction, Waterproof
Highest Working Temperature: 750
Still deciding? Get samples of $ !
Request Sample
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (14)
  • Supply Rockwool Blanket Project Schedule Synchronized
  • Supply Rockwool Blanket Project Schedule Synchronized
  • Supply Rockwool Blanket Project Schedule Synchronized
  • Supply Rockwool Blanket Project Schedule Synchronized
  • Supply Rockwool Blanket Project Schedule Synchronized
  • Supply Rockwool Blanket Project Schedule Synchronized
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Material
Dolomite
Spefication Temp
1260c
Chemical Composition
Al203+S102
Thickness
50-100
Kind
Rockwool
Bulk Density
60-200kg/M3
Shot Content
12%
Transport Package
Woven Bags
Specification
3600*600*50mm
Trademark
Thermaxcel
Origin
Shandong, China

Product Description

Supply Rockwool Blanket Project Schedule Synchronized
Supply Rockwool Blanket Project Schedule Synchronized
Product Description

Rock wool blanket has good thermal insulation performance, convenient construction and installation, remarkable energy saving effect, and high performance-price ratio; Rock wool blanket is a kind of thermal insulation material with low thermal conductivity.
Rock wool blanket products use basalt as raw material, have good non-combustibility, melting point is above 1000 ºC, especially effective in heat insulation, fire prevention, noise reduction or noise absorption.


Applications
It is suitable for thermal insulation, heat insulation, sound insulation and noise reduction of large pipelines, containers, storage tanks, boilers and transportation pipelines. The metal wire mesh with mesh wool reinforced on one side of the rock wool felt, its firm binding force ensures that the rock wool will not have any tearing and damage
It is used in tanks, boilers, large-scale steel structures, and external insulation of glass curtain walls with large plane and curvature radius. Pasting aluminum foil can meet the needs of heat insulation and water vapor barrier of HVAC air ducts, cold and warm water pipes, and building insulation requirements. Make indoors warm in winter and cool in summer, comfortable in all seasons
Supply Rockwool Blanket Project Schedule Synchronized

Supply Rockwool Blanket Project Schedule SynchronizedSupply Rockwool Blanket Project Schedule Synchronized

Brand    
    Properties
JC-Z650
Bulk Density (kg/m3) 80-150
(°C) Maximum use temperature 750
(%)Volumetric hygroscopic rate ≤1
(%)Mass hygroscopic rate ≤1
(w/m.k)                Thermal Conductivity 70ºC 0.038
150ºC 0.048
200ºC 0.056
300ºC 0.070
400ºC 0.085

Surface burning characteristics
Flue gas development index ≤25
Flame spread index 0
Size(mm) ** LENGTH*WIDTH*THICKNESS     1200*600*20/25/50/80/100MM
Supply Rockwool Blanket Project Schedule SynchronizedSupply Rockwool Blanket Project Schedule SynchronizedSupply Rockwool Blanket Project Schedule SynchronizedSupply Rockwool Blanket Project Schedule Synchronized

Supply Rockwool Blanket Project Schedule SynchronizedSupply Rockwool Blanket Project Schedule SynchronizedSupply Rockwool Blanket Project Schedule SynchronizedSupply Rockwool Blanket Project Schedule SynchronizedSupply Rockwool Blanket Project Schedule Synchronized

Q1 : How can you control your quality?

A1 : For each production processing, we have complete QC system for the chemical composition and Physical properties. After production, all the goods will be tested, and the quality certificate will be shipped along with goods. 

Q2 : What is your lead time? 

A2 : It usually needs about 15- 20 days after receiving the PO. 

Q3 : Do you provide free samples?

A3 : Yes, free samples are available, generlly speaking, the buyer shall bear all the delivery cost. 

Q4 : What is your payments terms?

A4 : We can accept 30% deposit, 70% balance to be against the BL copy or by LC, or other payment terms. 

Q5 : Can we visit your company?

A5 : Yes, for sure, you are welcome to visit JUCOS company. 

Q6 : What standards do you have?

A6 : Our products meet the standards, such as ASTM, ASME, AMS, DIN, JIS etc. 

      The third party testing is all available for us.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier